In time and work (समय और कार्य, kaam aur samay), if a person can finish a job in n days, the work done in one day is 1/n of the job. If A can finish a job in a days and B in b days, working together they take ab/(a + b) days, because their daily work 1/a + 1/b is added. The time for the whole job is always 1 divided by the combined daily work.
How do you solve time and work problems with the LCM method?
Take the total work as the LCM of the given days, find each worker's units of work per day, add them, and divide the total work by the combined units per day. For A in 12 days and B in 18 days the total is 36 units, A does 3 units and B does 2 units a day, so together they take 36 ÷ 5 = 7 1/5 days.
What is a man-day?
A man-day (आदमी-दिन, aadmi din) is the amount of work one man does in one day. Total work = number of men × number of days, so if more men do the same work they take fewer days: 5 men in 12 days is 60 man-days and 10 men take 6 days. With hours per day the rule is men × days × hours ÷ work is constant.
What is efficiency in time and work?
Efficiency (दक्षता, dakshata) is the amount of work a worker does in a given time. Efficiency and the time taken are inversely proportional: a worker who is twice as efficient takes half the time. If the times of A and B are in the ratio 2 : 3, their efficiencies are in the ratio 3 : 2.
How are wages shared in time and work?
Wages are shared in the ratio of the work done by each worker. For workers who work the same number of days, that is the ratio of their daily work, so A (12 days) and B (18 days) share a payment in the ratio 3 : 2.
What is the pipes and cisterns formula?
In pipes and cisterns (नल और टंकी, nal aur tanki), an inlet pipe fills a tank and has a positive rate of 1 divided by its time to fill, while an outlet pipe or a leak empties the tank and has a negative rate. The net rate is the sum of the inlet rates minus the sum of the outlet rates, and the time to fill the whole tank is 1 divided by the net rate.
The one idea: work done in one day
> If a worker finishes a job in n days, he does 1/n of the job in one day.
Rates add for people who work together; days never add. The time for the whole job is 1 ÷ (combined rate).
Situation
Rate and time
A alone in a days, B alone in b days
Together = 1/a + 1/b = (a + b)/ab, so time = ab/(a + b) days
A and B together in t days, A alone in a days
B alone: 1/b = 1/t − 1/a
Three workers a, b, c
1/a + 1/b + 1/c
Pair totals given (A + B, B + C, C + A)
Add the three; each worker is counted twice, so A + B + C = half the sum
Work done in d days by a team
d × (team rate); fraction left = 1 − that
The LCM (units) method
The LCM method for time and work: take the total work as the LCM of the days, find each worker's units a day, add them and divide
Take the total work as the LCM of the days given. For A in 12 days and B in 18 days the total is 36 units; A does 3 units a day, B does 2 units a day, together 5 units, so the job takes 36 ÷ 5 = 7 1/5 days. The same method works for three workers and for pipes.
Efficiency and ratio
Efficiency × time = work (constant), so efficiency and time are inversely proportional. Twice as efficient means half the time.
Time ratio A : B = 2 : 3 ⇒ efficiency ratio = 3 : 2.
25% more efficient means 5 : 4 in efficiency, so the time is 4 : 5. A rise of x% in efficiency cuts time by less than x% (a 60% rise cuts it by 37.5%); a fall of 20% in efficiency raises time by 25%.
Twice (or thrice) as good as B: let B's rate be x and A's rate 2x (3x), so together they are 3x (4x).
Wages are shared in the ratio of the work done, which is the ratio of the rates when the workers work the same days. A, B, C with 6, 8 and 12 days share in the ratio 1/6 : 1/8 : 1/12 = 4 : 3 : 2.
More men, fewer days: 5 men in 12 days is 60 man-days; 10 men take 6 days.
Man-days left: when men leave or join, find the man-days already used, then divide the man-days left by the new number of men. Food for a fort follows the same idea.
A man = 2 women means 6 men = 12 women, so the time is unchanged.
8 men + 12 women in 10 days with both groups multiplied by 1.5 take 10 ÷ 1.5 days; you need not know the man-to-woman ratio.
3 men dig 3 trenches in 3 days means 3 man-days per trench: 1 man digs 1 trench in 3 days. Likewise 5 machines make 5 items in 5 minutes, and so do 100 machines make 100 items.
Work in parts
One worker leaves or joins midway: find the fraction done, then the fraction left, then divide by the new rate.
Alternate days: work out one two-day cycle (A + B), find the whole cycles, and then the last few days one at a time. If the job is done inside a cycle, the last day may be a part of a day.
Equation form: if one worker works x days and the other x − 3 days, then x/a + (x − 3)/b = 1.
Quadratic problems: "A takes 6 days less than B and together they take 4 days" gives x² − 2x − 24 = 0, so x = 6 (reject the negative root).
Pipes and cisterns
Pipes and cisterns: inlets add to the net rate, outlets and leaks subtract, and the time to fill is one divided by the net rate
Inlet = positive rate (1/time to fill). Outlet or leak = negative rate.
Net rate = sum of inlet rates − sum of outlet rates. Time = 1 ÷ net rate for the whole tank; use the part of the tank still to be filled when the tank is part-full.
Leak: if a pipe fills in 6 hours but takes 7 hours because of a leak, the leak empties the tank in 1/(1/6 − 1/7) = 42 hours.
An inlet and an outlet of equal time never fill the tank.
Worked micro-examples
A 15 days, B 10 days. Together = 1/15 + 1/10 = 1/6, so 6 days.
A + B in 12 days, A alone in 20 days. B = 1/12 − 1/20 = 1/30, so 30 days.
A in 10, B in 15; B joins after 5 days. A does 1/3 alone; the rest 2/3 takes 4 days together; total 9 days.
₹1500 for A (12 days) and B (18 days). Ratio 3 : 2, so A gets ₹900.
Adding or averaging the days instead of adding the daily work.
Giving the part done when the question asks for the part left (and the reverse).
Forgetting a worker who leaves when counting the days that each person works.
Wages in the ratio of the days: use the ratio of the work actually done.
Pipes: forgetting the minus sign for the outlet or the leak.
Time and Work Problems Set 01
25 questions
Time and Work Problems Set 02
25 questions
Time and Work Problems Set 03
25 questions
Time and Work Problems Set 04
25 questions
Time and Work Problems Set 05
25 questions
Sample questions from this set
A preview with answers and explanations. Start the full set above for all questions, instant scoring and negative marking.
1.A can complete a piece of work in 10 days. In 1 day A completes ______ of the work.
A.10
B.1/100
C.1/5
D.1/10✓
Explanation: Given: A completes the whole work in 10 days.
Rule: Work done in 1 day = 1 ÷ (days taken)
Step 1: One day's work = 1/10 of the whole
Answer: 1/10 → option D
Trap: writing 10 (the number of days) as the part done.
2.A can do a piece of work in 12 days. What fraction of the work will A finish in 3 days?
A.1/3
B.1/9
C.1/4✓
D.3/4
Explanation: Given: A does the whole work in 12 days.
Rule: Fraction done = days worked ÷ days for the whole work
Step 1: Fraction = 3/12 = 1/4
Answer: 1/4 → option C
Shortcut: 3 days is a quarter of 12 days.
Trap: subtracting (12 − 3 = 9) instead of dividing.
3.A can finish a job in 20 days. How many days will A take to finish half of it?
A.10 days✓
B.40 days
C.5 days
D.15 days
Explanation: Given: Whole job = 20 days.
Rule: Time is proportional to the work done
Step 1: Half the work needs half the time = 20 ÷ 2 = 10 days
Answer: 10 days → option A
Trap: doubling the time instead of halving it.